I took Monday off this week to have the county guy come out for a required building inspection. He passed my roof and wall sheathing and the seismic strapping, so I can go ahead with getting the roof and siding installed. My roof underlayment should arrive at the Auburn Home Depot store for me to pick up by Thursday.
I added fascia blocking to three of the four eaves, with one left to do. Normally I would let the roof sheathing run long to cover a continuous fascia board so that I wouldn’t need to cut all those little blocks of wood, but my structural engineer drew it this way so that’s how I built it. The roof looks a lot more substantial with a solid edge.