I didn’t have as much time as I might have liked to work on the barn this past weekend. I got a bit of a late start on Saturday, and on Sunday I spent most of the day getting a Christmas tree for my grandmother’s house and putting up lights. That was fun though, so I’m not complaining. 🙂
I did manage to get the downstairs small door installed and flashed. I’ve had the door since before I even started building the walls, but I hadn’t put it in. My foundation contractor wound up making the door gap two inches smaller than I had intended, and rather than having him come back and try to cut the concrete I decided it would be much easier to just order a door to fit. I had wanted to make sure that I could get one however, so I ordered it as soon as the foundation was finished; it has been sitting around ever since. Now it’s finally installed!