Brendan came out for several days and helped me get my framing off to a good start. We got the sills down, one lower wall completely framed and a good portion of the other three walls done as well.
I’m building the walls in place instead of tilting them up because the raised sill makes tilting them into place a challenge. It’s also easier to manage with a small crew, and I don’t have to wrestle a complete wall onto the anchor bolts.